Two very different builds get sold as a walk-in shower. One keeps a small dam and sits on the floor you already have. The other has no dam at all, which means the shower floor has to start lower than the room.
Call (402) 698-8275Upfront pricing · No obligation · Local Sarpy County technician
Six boxes, about thirty seconds. You pick when to be called back, and that is when the phone rings.
Or call (402) 698-8275A low threshold shower keeps a modest curb, often an inch or two, and can usually be built on the existing floor plane with a manufactured base. A level entry has nothing to step over, so the shower floor has to begin below the surrounding finished floor for the required fall to send water to the drain instead of into the room. That single difference drives the framing, the drain work, the permit path, and most of the price gap. Both are legitimate answers. Only one of them is a base swap, and plenty of households are better served by the version that keeps a small curb and spends the savings on the fixtures they use daily.
Here the recess usually happens in a joist bay rather than in concrete. NAHB's analysis of the Census Survey of Construction found 62.3 percent of new single-family homes started in the West North Central region during 2024 had a full or partial basement, and older Bellevue stock follows the same habit. That is genuinely good news for a level entry: joists can often be headed off or a low-profile assembly set between them without breaking a slab. Joist direction and depth decide what is possible, and the finished ceiling below is part of the job, so the room under the bathroom gets opened, inspected, and put back.
A house is not required to meet the ADA standards, but the dimensions in them are the most useful yardstick available. Section 608 sets a transfer type shower at 36 by 36 inches with a 36 inch entry and a 36 by 48 inch clear space measured from the control wall. A standard roll-in is at least 30 inches deep by 60 inches wide with a 60 inch entry, and an alternate roll-in is 36 by 60 with the entry at one end of the long side. Hold those numbers against the old tub alcove, which is commonly five feet long, and you learn quickly whether a wheelchair or a walker will turn in this room or whether depth has to be borrowed from a closet or hallway behind the wet wall.
Grab bars are structural, and where they land is a framing decision made long before the tile layout. Solid backing across the wet wall, set at the heights the person actually reaches, costs very little while the studs are exposed. After tile goes on, bar placement is limited to wherever the studs happen to fall. The accessibility standards are again a useful guide: in a transfer type shower, bars run across the control wall and the back wall to a point 18 inches from the control wall. Those same standards allow a residence to skip the seat itself if the wall reinforcement for one is installed, which is exactly the right way to handle a bathroom that has to serve the household for another twenty years.
Before anything gets drawn, observe. Which hand goes out first, and to what. Whether the person sits to wash or stands. Whether balance fails on the step or on the turn. Whether help arrives from inside the spray or from the dry side of the opening. Whether the water can be brought up to temperature without standing under it, because waiting out a cold start is worse in a Nebraska February than anywhere warm. Those observations, rather than a product brochure, place the bench, the fixed head, the handheld, the controls, and the bars. A layout that skips this step produces a technically accessible shower nobody enjoys standing in.
Many of these projects happen in a finished basement, where a level entry is easier because the drain is already below the slab. Two things follow. First, Nebraska DHHS reports the Sarpy County radon average at 5.3 picocuries per liter across 5,649 tests between October 2019 and September 2024, and more than half of tests statewide come back above the 4.0 action level. That is why every new opening cut through the slab gets sealed as it is made and any existing mitigation piping stays intact. Second, moisture history is fair to ask about in a lower level, given that water reached Offutt Air Force Base on March 15, 2019 and roughly 30 buildings there were affected.
Moving a drain makes this regulated plumbing. Under Neb. Rev. Stat. 18-1917 the work belongs to a master plumber licensed by the city or village nearest the site, with licensed journeymen doing the installation, and Bellevue requires the plumbing permit to be applied for and signed by that master plumber rather than by the homeowner. Contractor registration with the Nebraska Department of Labor is a separate requirement, and the Department states plainly that it does not ensure quality of work. Expect this order: reach and layout decisions, permits, demolition, floor framing and drain work, blocking for bars and bench, rough plumbing, inspection, membrane and flood test, sloped base, tile, glass templated on finished walls, then fixtures and bars. Entry type, whether the drain moves, borrowed space, and glass set the range.
Walk-In Shower Installation in Bellevue. Call (402) 698-8275 and a technician is dispatched with the parts on the truck. You get the price before the work starts.
Call (402) 698-8275Bellevue Public Schools records that on May 20, 1959, it and the Secretary of the Air Force entered a lease for a school within the Offutt Family Housing Annex known as Capehart Housing; the first of three elementary schools there was dedicated in 1961.
Why it matters: Base-adjacent Bellevue housing spans a long period, so a bathroom scope should be based on the room in front of the remodeler. Compact layouts, limited wall depth, layered finishes, tight access, and earlier updates need to be measured before fixtures and tile are selected.
Source: ne50000580.schoolwires.net
During the March 2019 Missouri River flood, water began reaching Offutt Air Force Base on March 15; two days later the Air Force reported water affecting roughly 30 base buildings and stated that personnel were battling historic flood conditions.
Why it matters: For basement bathrooms and lower-level finish work, the 2019 event makes it sensible to inspect for moisture evidence, prior repairs, and suitable substrate before new flooring, wall finishes, or a shower assembly conceal the space. It does not mean assuming every lower level has damage.
Sources: offutt.af.mil · bellevue.net
Bellevue’s Permits and Inspection Division says regulated construction, alteration, repair, improvement, or conversion requires a permit unless exempted, and separate plumbing, mechanical, and electrical permits are required unless exempt. It also says replacement plumbing material or rearrangement of pipes or fixtures is new work for which permits and inspections are required.
Why it matters: A bathroom project that changes drains, supply lines, fixtures, ventilation, walls, or electrical work needs its permit-sensitive scope identified before demolition. Those review and inspection points belong in the construction sequence before new walls, tile, or flooring conceal the work.
Source: bellevue.net
Upfront pricing · No obligation · Local Sarpy County technician